
Add to Cart
Product name | SK300 Excavator Track chain 48L |
---|---|
Oem number | 24100J10382F3 |
Color | Yellow/Black |
OMQ | 2 PCS |
Weight | 740 Kgs Per Piece |
Stock Condition | 30 pcs in stock |
Type | Crawer Excavator track chain assy |
Category Group | Underacrriage track chain |
Fits Model | SK330 SK350 SK370 |
Related items | Track bolt and nut ,Track shoes,Track roller, Front Idler,Sprocket,Top roller |
A (bush center to bush center) | 203 MM |
B (bolt center to bolt center side) | 72 MM |
D (bolt center to bolt center longer) | 178 MM |
E (bolt center to bolt center shorter) | 138 MM |
F (dia of track bush) | 66.8 MM |
G (dia of track pin) | 45 MM |
L (bolt size) | 22 MM |
Length of Track Shoe | 600 MM |
Loose Links | 48L |
WHY CHOOSE US
►Wooden pallet ►White/Black sack ►2 pcs White sticker ►Plastic belt
Model | Name | Pitch | Oem no. |
CAT225B | LINK(46L) | 175.5 | 5A5293 |
CAT225D | LINK(49L) 19.3mm | 190 | 6Y8184 |
CAT320 | LINK(45L) | 190 | 9W9354 |
CAT325 | LINK(45L) | 203 | 6Y0854 |
CAT330 | LINK(45L) | 215.9 | 6Y2755 |
CAT235 | LINK(49L) | 215.9 | 8E4274 |
EX40/45 | LINK(38L) | 135 | 9087953 |
EX60 | LINK(37L) | 154 | 9096710 |
EX100 | LINK(41L) | 171.45 | 995398 |
EX100M(EX150) | LINK(45L) | 171.45 | AT159899 |
EX200-1 | LINK(48L) | 175.5 | 9066724 |
EX200-3 | LINK(46L) | 190 | 9092517 |
EX300 | LINK(47L) | 203 | 9140549 |
ZX330 | LINK(45L) | 216 | 9202851 |
EX400-1 | LINK(49L) | 216 | 9084353 |
EX550 | LINK(53L) | 228 | 9137494 |
EX700/750/800 | LINK(51L) | 260 | 9152643 |
EX1100-3 | LINK(52L) | 260 | 9104792 |
SK60 | LINK(38L) | 154 | 24100N6311F2 |
SK100 | LINK(41L) | 171 | 24100J16939F1 |
SK120 | LINK(43L) | 171.1 | 24100J16939F1 |
SK200-8 | LINK(49L) | 190 | LQ62D00015F1J1A |
SK300 | LINK(47L) | 203 | 24100J10382F3 |
SK220LC | LINK(45L) | 24100J12450F1 |
Q1: What are your Main Products ?
We are specialized in spare parts for excavator undercarriage and bucket parts, such as bolt and nut , bucket pins and bushes, track chain , track roller, track shoes, track pin and bush,etc.If you need other excavator parts, we also can supply as your requirements.
Q2: How to ensure that every process's quality?
Every process will be checked by our quality inspection department which insures every product's quality. In the production, we will personally go to the factory to check the quality of products.
Q3: Can you provide sample?
Sure,free samples offered if it is in stock.As for customized samples you will be asked for tooling charge.
Q4:What is your Delivery Time?
Generally, we will arrange the goods within 24 hours after your payment; if not in stock, stocking time is 3-20 days.
Q5: How do I pay?
You are required do the payment by T/T.If the delivery time more than 20 days you should pay 30% first for deposit.Besides,you need pay 100% before loading.